Assessment of factors and development of a methodology for determining the duration of restoration work of damaged buildings
Abstract
Assessment of factors and development of a methodology for determining the duration of restoration work of damaged buildings
Incoming article date: 03.11.2024Abstract: This article is devoted to the formation of a methodology for determining the duration of emergency recovery work, in case of damage to buildings and their structures from the effects of force factors, which is an important industrial and social task. The main indicator adopted in this article for calculating the duration is the duration criterion (Upr). In the course of the study, factors were formed and grouped according to segmental characteristics, based on the degree of their influence on the duration of emergency recovery operations, a multiple regression equation was compiled, which allowed taking into account the influence of the most significant factors on a single assessment scale. The findings of the study are supposed to be used to determine the duration of emergency recovery work. Thus, the methodology for determining the duration of work is an important tool in the complex of measures for the effective conduct of restoration work and minimizing costs.
Keywords: emergency recovery work, organizational and technological model, method of expert assessments, multiple regression equation, capital construction project, technical condition of the building, force impact, ranking, duration of emergency recovery