The existing classification of social objects is considered, using the example of school buildings with a link to the capacity of pupils and the location in settlements of different types. The key external and internal factors that influence the decision of the construction organization to sign a contract for the construction of school institutions are identified, the problem is described - insufficient transport accessibility, lack of resource base, Construction time lag in the implementation of social projects. The influence of the chosen design solution, as well as climatic conditions on project implementation dates was considered.
Keywords: classification of social purpose objects, influence of constructive decisions on the realization of construction object, the ratio of transport accessibility of regions, supply of resource base
The paper considers the modern principles of the organization of the technical customer service. The disadvantages of the existing system of forming the structure of the technical customer are indicated.
Keywords: technical customer, organizational structure, self-regulating organizations, national register of specialists, construction control ensuring production flexibility
The article describes the main stages of development of the rationing system, as well as foreign analogues. The development of the rationing system and their development potential are described.
Keywords: rationing system, production efficiency, competitiveness, modern standards
The implementation of any construction project is successful only when it is rational planning. At the stage of pre-construction preparation one of the main problems of planning are: the presence of order in the organization of pre-construction preparation, the presence of a modern design and the regulatory framework, the definition of the resource with the time factor, the definition of adequate duration and timing of the project. Selecting the most reliable method of determining the stage of pre-analysis, resource support of the construction process to a large extent affect the implementation of the project. In conditions of uncertainty are the most efficient flexible systems. The technique of construction and update of one of these systems is described in the article.
Keywords: planning, resources, the duration of the scheme, the model, the process